Case History: Multimatic Richmond Hill, Ontario Problem: Long time client Multimatic needed a fully open 2 Story workspace area on both the ground floor and second story for their Quality Assurance Lab. Solution: Multimatics new quality assurance lab is a testament to the flexibility and re-purposing of ProPart Modular’s System 40™ two-story Mezzanines. Multimatics new structure is composed entirely of standard […]
Case History Example: Tech-Con Automation Burlington, Ontario Problem: Long time customer Tech-Con Automation needed a custom enclosure for one of their specialized waterjet robotic units. The enclosure and robotic unit needed first to be constructed in Tech-Con Automation’s Canadian plant, then later disassembled and shipped to Mexico where it could easily be reconstructed. Solution: ProPart […]
Case History Example: Schenker Mississauga, Ontario Problem: Schenker, a leading international provider of integrated logistics services, needed an in plant office in their busy Canadian headquarter location. They wanted support staff closer to the action Solution: ProPart Modular’s System 40™ In Plant Office was the perfect solution. Close to the loading docks, our patented System 40™ modular […]
Case History: Coffee Office, Oakville, Ontario Problem: The Coffee Office, a unique professional office rental service needed to convert 8500 square feet of empty industrial space into private, secure, individual executive offices. Solution: ProPart Modular was awarded the job because of a proven track record with sound reduction. With an STC rating of 44, ProPart […]
Case History: NuTech Engineering Inc. Milton, Ontario Problem: NuTech required a fully demountable custom enclosure for an oversized laser robotics assembly, to be disassembled and shipped overseas at a later date. Solution: System 40™ components were used to create a fully demountable custom enclosure. Due to the size of the large robotics device contained within, an oversized […]
Case History: Techspan, Mississauga, Ontario Problem: Techspan wanted to remodel their executive corner offices. With an existing schematic they wanted to know if anyone could accommodate a custom design utilizing modular components. Solution: ProPart Modular did exactly what they asked “Not only did they accommodate our design requirements,” said Gerald Dunnigan, Chairman of Techspan Industries […]
Case History Example: Pfizer Pharmaceuticals Arnprior, Ontario Problem: Pfizer Pharmaceuticals, a large multinational pharmaceutical company needed a rather unique solution for wall dividers in a packaging area of their plant in Arprior. Solution: In a sensitive packaging area such as this, a dust free environment is critical, so extra measures need to be taken to […]
Case History Example: Atlas Tires Wholesale Inc. Mississauga, Ontario Problem: Atlas Tires Wholesale Inc. needed two separate In Plant Offices for their two busy Mississauga warehouses. Solution: Selecting from available In Stock inventory Atlas asked that ProPart Modular customize each unit to accommodate specific requirements. Surrounded by stacks and stacks of tires, these offices now provide usable, […]
Case History Example: Global Aerospace Mississauga, Ontario Problem: Having just moved into a brand new facility in Mississauga, Global Aerospace needed an In Plant office and Mezzanine structure for storage in their production plant. Solution: Global Aerospace purchased both a System 40™ In Plant office and Mezzanine structure from ProPart Modular. The ease and speed of installing a […]
Case History Example: Soft Drink Company Toronto, Ontario Problem: A major soft drink company needed a Smoke Shelter for staff at their headquarters location in Toronto but wanted it to match the existing architecture of their head office. Solution: They decided to go with a ProPart Modular solution. A custom 8′ x 12′ smoke shelter with tinted […]