Case History Example: Cocomira Toronto, Ontario Canada Problem: Preparing gourmet toffee in the food industry is not for everyone. Because it generates so much heat many won’t even attempt it. To manage the heat in their facility, Anna Janes, founder of Cocomira, needed to section off the kitchen from the production area. Solution: Working closely […]
Case History: Canadian Babbitt Bearings Ltd. Brantford, Ontario Problem: Canadian Babbitt Bearings Ltd. required a new Quality Assurance Lab for their busy manufacturing plant in Brantford, Ontario. They needed an environment where the humidity and dust levels could be kept to within very strict tolerances, and the ceiling height needed to accommodate an oversized crane installed […]
Canadian Babbitt Bearings Ltd. required a new Quality Assurance Lab for their busy manufacturing plant in Brantford, Ontario. They needed an environment where the humidity and dust levels could be kept to within very strict tolerances, and the ceiling height needed to accommodate an oversized crane installed within. The room was built in stages. First, […]
Multimatics new quality assurance lab is a testament to the flexibility and re-purposing of Provincial Partitions System 40™ Mezzanine and In Plant Office components. Multimatics new structure is composed entirely of standard System 40™ parts from a previous installation. Not only were the refurbished components fully customizable to the clients’ new configuration requirements, but a significant cost […]
A referral client, QSS Precision Components, initially required a new lunchroom for their busy manufacturing facility and approached Provincial Partitions to provide a modular space solution. After witnessing the ease, convenience and speed of the System 40™ installation, company President Bob McLeod ordered an additional Quality Assurance In Plant Office to be installed at the same time. […]
Exco Engineering needed an alternate solution to the partitioning of their 130,000 square foot facility. Previously, they would erect block walls to separate the various work areas situated throughout the plant. As needs changed, they would have to demolish those same walls, each time, only to rebuild them in a different location. They needed a much […]
The Toronto Transit Commission, a long time and loyal client of Provincial Partitions, needed additional in plant office space for their busy maintenance garage located in Toronto, Ontario. The only problem was; they were running out of space in an already crowded repair facility. After consulting with the client, it was determined that two separate […]
Provincial Partitions is growing and we needed office space, pronto. Lucky for us, we know exactly how to accomplish this. We had space enough for four new offices in an area behind reception and were able to install all four offices in less than two days. They were fully furnished the very next day, phone […]
Technophar Equipment and Services Ltd., a manufacturing company primarily servicing the pharmaceutical industry, needed a large Clean Room facility to showcase their custom manufactured packaging line equipment. After doing the research, they opted for a Provincial Partitions modular space solution, largely because of Provincial Partitions proven track record in constructing Clean Rooms. Using primarily standard Provincial Partitions System […]
360 Mobile, one of the largest Telus dealers in the country, needed to convert empty warehouse space into a new state-of-the-art executive office space. Having previously installed a Provincial Partitions mezzanine it was easy to build out the existing structure to include the new Office Partitions. After all was said and done, a total of […]