©2019 by ProPart Modular.

  • ProPart Modular

Case Study: Global Aerospace System 40™

Case History Example:

Global Aerospace

Mississauga, Ontario


Problem: Having just moved into a brand-new facility in Mississauga, Global Aerospace needed an In-Plant office and Mezzanine structure for storage in their production plant.


Solution: Global Aerospace purchased both a System 40™ In Plant office and Mezzanine structure

from ProPart.


The ease and speed of installing a System 40™ solution was what sold Global on their decision to go with ProPart. The System 40™ In Plant Office went in very quickly, and if required, can easily be re-located in the future because all components on both are assembled without mechanical fasteners and all panels are interchangeable. Both installations went together with the simplicity of System 40™’s unique “Plug-And-Play” flexibility.


ProPart's steel mezzanine structures are custom engineered to suit each and every job application. All structural components bolt together: ensuring complete flexibility in the event needs change in the future.
































At ProPart Modular, we specialize in projects both large and small. We do the work that others can’t. Flexibility and convenience make all of ProPart product offerings the ideal space management choice.


To request a quotation on how your next building project might benefit by using our unique line of modular space solutions, please feel free to contact us directly at sales@pro-part.com